©
A
ir
B
orne
W
ind
S
ports
P
ty.
L
td.
SECTION 4
Aircraft Operating Instructions Edge XT 912
NORMAL PROCEDURES
January 2014
Issue 2.4
Page 76
4.10.12 Arrow Only - Undo Strut Bolts at Leading Edge
Remove the safety pin and wingnut from the connecting
bolt. Gently move the leading edge forward or rearward
to take any weight off the bolt and slide it out. Replace
the bolt, wingnut and pin into the strut. Repeat for the
other side.
Figure 40 Section 4. Remove Strut to Leading Edge Connecting Bolt
4.10.13
Arrow Only - Remove Control Frame Connecting Bolt
Expose the control frame wingnut by moving the strut forward to be line with the downtube. Remove the
safety pin, undo the wingnut and remove the bolt. Replace the bolt in the strut once removed.
Figure 41 Section 4. Remove Control Frame Connecting Bolt
4.10.14 Remove Main Sail Battens
Pull the leading edges together approximately 1/2 metre.
Remove the remaining main sail battens. Insert battens
in the batten bag.
NOTE
The straight battens are inserted in separate pockets.
Figure 42 Section 4. Remove Main Sail Battens