![AIC N 100 WH Installation And Maintenance Manual Download Page 39](http://html1.mh-extra.com/html/aic/n-100-wh/n-100-wh_installation-and-maintenance-manual_2870754039.webp)
I-39
Z-038791_EN • Rev A
P
roduct
I
nstallatIon
Combustion circuit
Sealed
Connection
Vertical terminal
Air inlet/fl ue outlet orifi ces
Separate ducts
, both connected to a
roof
terminal
:
î
Flue duct: connected to a vertical terminal
î
Air inlet: through an existing duct
î
Roof terminal admits combustion air from the
outside AND discharges fl ue to the outside
OR
î
Both orifi ces are close enough to come under
similar wind conditions.
Remark
Airtight operation is possible in existing chimney,
provided that:
î
It has been cleaned prior to installation
î
Clearance area is suffi cient for combustion air
(min the size of 2 separate ducts)
C
93(x)
Make sure to install AIC-approved components from Muelink & Grol when build-
ing C13(x), C33(x), C53(x) and C93(x) systems. See
C
63(x)
Combustion circuit
Sealed
Connection
To a system that is approved and sold separately
(external supplier)
Air inlet/fl ue outlet orifi ces
May terminate in zones of diff erent pressure
Additional requirement
î
Maximum allowable draught is 200 Pa.
î
Maximum allowable pressure diff erence between combustion air inlet and
fl ue gas outlet (including wind pressures) is indicated in the technical spec-
ifi cations.
î
Condensate fl ow is allowed into the appliance.
î
Maximum allowable recirculation rate of 10% under wind conditions
î
Orifi ces may NOT terminate on opposite walls of the building
î
The fl ue gas exhaust pipes must at least comply with the category T120 H1
W1/2 O30 LI E U when using parallel piping and T120 H1 W1/2 O00 LI/LE
E U0 when using concentric piping (EN 14471).
This type of connection is prohibited in some countries - refer to local regulations and
standards in force
Please also refer to the additional information in
“Engineering the Chimney System” on
for the construction of your chimney system.
i