Version April 2008
EN
11
agru SP 315-S User’s Manual
1. CEE Power Outlet 32 A
2. CEE Power Plug 32 A with integrated phase inverter
3. Contact Socket for Phase 3 (L3)
4. Contact Socket for Neutral (not needed with SP 315-S)
5. Contact Socket for Earth Ground (PE); a little thicker
than the other sockets
6. Contact Socket for Phase 1 (L1)
7. Contact Socket for Phase 2 (L2)
8. Contact Pin for Phase 3 (L3)
9. Contact Pin for Neutral (not needed with SP 315-S)
10. Contact Pin for Earth Ground (PE); a little thicker than
the other pins
11. Contact Pin for Phase 1 (L1)
12. Contact Pin for Phase 2 (L2)
Prior to starting to first use the machine, the power supply connection
has to be verified. Across any two phases (L1-L2, L2-L3, L1-L3) a volt-
age of 400 V AC ± 10 % has to be found. If a neutral is wired to the same
power supply socket, across any of the three phases and the neutral, a
voltage of 230 V AC has to be found. These measurement can be take
with any common voltmeter for alternating current voltages.
If connected appliances are equipped with a motor requiring 3-phase
alternating current supply, as is the case with the SP 315-S, the rotating
field of the machine has to have the proper direction. The SP 315-S checks
this and if the rotation is incorrect, a “Power Supply Error” message is
displayed. To change the direction of the rotation of the field, the phase
inverter in the plug can be used. Two of its contact pins are placed on
a grey turning disk. A flathead scredriver can be used to turn this disk,
thereby inverting the positions of the two pins, which in turn inverts the
rotation of the field.
3.3
Welding Process Overview
The welding process is performed as follows:
s
0IPES ARE CLAMPED INTO THE FRAME DEPENDING ON THE FORM OF THE
component to be welded, this may mean that the outer clamps have
to be re-adjusted or that reducer inserts have to be inserted.
s
0IPEBUTTSAREWORKEDBYTHEFACINGTOOLWHICHISINSERTEDAUTOMATI
-
cally, to obtain abutment along a fully parallel plane.
s
0IPEALIGNMENTISCHECKEDANDCONFIRMEDONTHETOUCHSCREEN
s
!UTOMATIC INSERTION OF THE HEATING ELEMENT WHEN INSERTING IT THE
heating element has to be clean.
s
!FTERTHEHEATINGELEMENTWASINSERTEDTHEPIPESCLOSEINAUTOMATI
-
cally at the predefined force.
s
7HEN THE CARRIAGES CLOSE IN THEY ALSO ALIGN THE HEATING ELEMENT
exactly in-between the pipe butts.
s
!TTHESAMETIMETHEPIPEBUTTSAREHEATEDTOTHEPREDEFINEDTEM
-
perature.
s
7HEN THE HEATSOAKING PHASE IS OVER THE PIPES ARE MOVED APART
and the heating element is removed automatically.
s
/NCETHEHEATINGELEMENTISREMOVEDTHEPIPESCLOSEINAGAINAU
-
tomatically.
s
4HISISFOLLOWEDBYASTEADYFORCEINCREASEUNTILTHEFUSIONFORCEIS
reached.
s
4HEPIPETHENCOOLSDOWNATTHEPREDEFINEDFORCE
s
!FTER THE COOLING TIME IS OVER THE FORCE IS AUTOMATICALLY REMOVED
from the carriages and the pipe or fitting can be taken out of it.
Summary of Contents for SP 315-S
Page 2: ......