Place the arm on the numbered sector from 0 to 100
depending on the seed used.
3.1.2.7.
Flow rate test procedure
When the batcher pitch, the opening of the moveable base and the variator lever have been adjusted,
carry out a batcher test:
Slide the tube lowering support bar (G)
forwards, releasing the levers (H) holding it in its working
position.
Turn the SUN wheel a few times until the seed starts to
fall into the trough.
Remove the seed and then turn the sun wheel the
required number of times according to the width of the
seeder.
Recover the seed and weigh it.
Multiply the result by 40 to obtain the flow rate per
hectare.