INSTALLAZIONE
4
INSTALLATION
RV - RVL
4-15
4.4
Supporto albero cardanico
La trinciatrice ha, in dotazione, un supporto per
l’aggancio dell’albero cardanico quando questa è in
condizione di riposo (Fig. 4-13).
4.4
Cardan shaft rest
The shredder is fitted with a special rest for the cardan
shaft connection which can be performed while the
shredder is standing by (Fig. 4-13).
Summary of Contents for RV 125
Page 6: ...AVVERTENZE 0 WARNINGS 0 2 RV RVL Fig B Fig D Fig C Fig E Fig A Fig F Fig G D C D F G B A E ...
Page 10: ......
Page 24: ......
Page 28: ......
Page 42: ...INSTALLAZIONE 4 INSTALLATION 4 14 RV RVL Fig 4 13 Supporto albero cardanico Cardan shaft rest ...
Page 44: ......
Page 50: ......
Page 52: ...USO 6 USE 6 2 RV RVL Fig 6 1 Rullo di appoggio Support roller 1 2 3 RV RVL 1 2 3 ...
Page 60: ......
Page 66: ...MANUTENZIONE 8 MAINTENANCE 8 6 RV RVL Fig 8 4 Sostituzione olio Oil change 3 2 1 ...
Page 68: ...MANUTENZIONE 8 MAINTENANCE 8 8 RV RVL Fig 8 5 1 3 2 ...
Page 72: ......
Page 82: ......