L4411A Getting Started Guide
73
Rack Mounting
4
If center-facing columns with holes are present on the frame, insert a clip-on
nut on the hole perpendicular to the center hole on the front facing column.
See Figure 4-3.
Figure 4-3. Rack Column and Shelf Rail Orientation.
2. With the rail “channel” facing the center of the rack, connect the rail to the
front facing column using a 10-32 flathead screw (item 4) and the center
clip-on nut on the front-facing column. Repeat for the rail on the opposite
column. Ensure the rail channel faces the center of the rack.
If the rack has center-facing columns (Figure 4-3), insert a 10-32 pan head
screw through the rail opening and clip nut (perpendicular to the front-facing
column). Repeat for the rail on the opposite column.
3. On the rack’s rear-facing columns, insert clip-on nuts on the first and third
holes between the EIA unit indicators that are at the same vertical position as
the indicators on the front-facing columns.
(center of rack)
front-facing columns
center-facing colums
back of rack
insert clip nuts
between rack unit
indicators
insert clip nut
if column present
insert clip nuts
on first and third
holes between indicators
rail “channel
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com