![Agilent Technologies AssayMAP Bravo Installation Manual Download Page 32](http://html1.mh-extra.com/html/agilent-technologies/assaymap-bravo/assaymap-bravo_installation-manual_2867689032.webp)
Installing the platform
Installing the Peltier Thermal Station
24
AssayMAP Bravo Platform Installation Guide
b
Ensure that the safety label
faces the front of the Bravo deck.
c
Press and hold from the bottom to squeeze in the metal as you insert
the Peltier Thermal Station assembly into the hole.
d
Position the bracket over the top of the assembly, and ensure the
bracket is seated on the deck surface.
e
If there is slight resistance when fitting the assembly into the cutout or
when positioning the bracket, you may use a rubber mallet to tap the
metallic base or bracket into place.
Figure
Tapping the Peltier Thermal Station bracket in place
f
Ensure that the Peltier Thermal Station sits flush in the cutout and
that the bracket is seated on the Bravo deck.
5
Use a hex driver to install the four M3 bolts that secure the bracket to the
deck.
Figure
Securing the Peltier Thermal Station to the deck
CAUTION
Using too much force with a rubber mallet can damage the Peltier
Thermal Station.