Installing the platform
Installing the 96AM Wash Station and Pump Module
14
AssayMAP Bravo Platform Installation Guide
Figure
96AM Wash Station secured with platepad brackets
Tubing connections for 96AM Wash Station
The following figure shows the AssayMAP Bravo tubing connections for the
96AM Wash Station. As the figure shows, the upper pump (
A
) is for the fill
line and the lower pump (
B
) is for the empty line.
Note:
You specify which pump is for filling and which pump is for emptying in
Bravo Diagnostics.
Figure
96AM Wash Station fill line (
A
) and empty line (
B
)
To ensure proper chimney filling and waste emptying characteristics for the
96AM Wash Station, ensure that you use the proper tubing combination for the
Pump Module. See the following figure and table.
A
B
Source
Waste