46
P1512161 R0
3.15. Assemble the Main Conveyor Boot
Install the Boot Flashing
1. Attach foam tape onto the hopper weldment. See
Figure 36.
Foam Tape
2. Drill 3/8" holes through the foam tape using the existing hopper holes as guides.
3. Apply glue underneath the flashing pieces as shown in
.
4. Place the front flashing onto the hopper.
5. Place the side flashing on top of the front flashing.
6. Make sure all flashing pieces are flush. Ensure that there are no gaps between the flashing and the belt.
Secure into place until the Swing Away is mounted on.
Figure 37.
Rubber Flashing
The main conveyor hopper is now ready for the installation of the boot base.
SWING AWAY CONVEYOR – PORTABLE GRAIN BELT CONVEYOR