Ag Leader Technology
DirectCommand Installation
Raven Accu-Flow ISO Kit
Page 6 of 15
February 2015
PN: 2006375 Rev. B
Installing
the Liquid
Product
Control
System
Parts required for procedure:
From DirectCommand Kit
:
(1) Large Module Mounting Kit
PN: 2001370
(1) ISOBUS Breakout Cable
PN: 4002597-008
(1) Liquid Rate Control Module
PN: 4002861
(1) Local CAN Terminating Plug
PN: 4002870
(1) Local CAN Terminating Rec.
PN: 4002871
(1) ISOBUS Active Term. Cable
PN: 4003122
(1) ISOBUS Implement Cable
PN: 4004110-12
Step-by-Step for
Installing the
Liquid Product
Control System
1. Determine a mounting location for the Liquid Rate Control
Module PN: 4002861. Make sure to choose a mounting location
that is big enough for Liquid Swath Control Module PN: 4002862
if it is needed. Mount modules where they will be protected from
impact and other hazards.
2. Use the 5 inch carriage bolts and 5/16 hardware from the Large
Module Mounting Kit PN: 2001370 to mount the modules to the
Module Mounting Plate.
3. Use the 7 inch carriage bolts, 5/16 hardware, and Large Module
Bracket Strap from the Large Module Mounting Kit to mount the
Module Mounting Plate to the machine.
Rate and Swath Control Modules Mounted to Plate
4. The cables leading from the Liquid Product Control Module to the
Accu-Flow controls and the cooler are six feet in length, so mount
Liquid Product Control Module where cables will reach.