DirectCommand
Installation
Raven Accu-Flow ISO Kit
Ag Leader Technology
PN: 2006375 Rev. B
February 2015
Page 5 of 15
Safety
Notices
CAUTION: Implement should be lowered to ground or on
mechanical safety stops before starting work. Do not work on
implement supported by hydraulic system only.
CAUTION: Be sure to wear proper eye protection when using any
power tools, such as when drilling any mounting holes.
IMPORTANT: Check behind vehicle and implement panels for any
hoses, wiring, controls, etc. that could be damaged when drilling
any mounting holes.
IMPORTANT: Disconnect Ag Leader Display, DirectCommand
components and flow meter from electrical system when welding
on equipment or jump starting unit to prevent component damage
due to power surges or excessive current
IMPORTANT: If using a non Ag Leader GPS receiver, make sure
to install the Null Modem Cable included in the Display kit, to
prevent damage to the Display or the GPS receiver.
IMPORTANT: Use the Dielectric grease to coat the seals and
terminals of each connector that will be exposed to weather or
chemicals as you plug them in.
NOTE: Be sure to follow the alignment keys on the plugs and the
receptacles carefully. Do not use excessive force when mating
connectors.
IMPORTANT: Do not drill holes in tool bar mainframe. Due to high
stress loads on toolbar, cracking may occur from drilled holes.