Ag Leader Technology
DirectCommand Installation
Raven Accu-Flow ISO Kit
Page 2 of 15
February 2015
PN: 2006375 Rev. B
Important
Notices
You will save time and prevent wrong installation of components
by closely following these step-by-step instructions. If you have
questions, call
Ag Leader Technology
at 515-232-5363 ext. 1.
Direction words (LEFT and RIGHT) are commonly used when
describing an installation procedure. Interpret direction words as if
standing behind equipment and looking forward.
Signal words
(CAUTION, IMPORTANT
and
NOTE
) are provided
to draw attention to information that is important for the
safe/correct installation and operation of this product.
CAUTION
– will alert you to situations that will impact the
physical safety of you or others.
IMPORTANT
– will alert you to the potential for damage to
the product or loss of data.
NOTE
– will provide you with additional information to
simplify a procedure or clarify a process.
Read all instructions first to familiarize yourself with the
installation procedures.
Keep parts list and installation instructions for use as a
reference after completing installation.
Section
Contents
Item Page
Common Components
3
Component and Cable Layout
4
Safety Notices
5
Installing Liquid Product Control System
6
Installing the Accu-Flow Cabling
8
Installing the ISO Swath Control Kit (Optional)
10
Installing the Implement Switch (Optional)
12
Setting Up the Display
14