DirectCommand
Installation
Raven Accu-Flow ISO Kit
Ag Leader Technology
PN: 2006375 Rev. B
February 2015
Page 9 of 15
6.
Connect the 2-pin plug of the Flow Control Channel Cable to the
mating receptacle on the Liquid Rate Control Module.
Note: Steps 7-10 are for toolbars that utilize a Main On/Off Valve
and Auxiliary Valve.
7.
Connect the 4-pin Deutsch receptacle of the Auxiliary Valve
Harness, from Table A above, to the mating plug on the Flow
Control Channel Cable.
8.
Tee the gray 2-pin connectors of the Auxiliary Valve Harness into
the gray 2-pin connectors of the Flow Control Channel Cable.
Flow Control Channel Cable and Auxiliary Valve Harness
9.
Plug the connector labeled “Aux Valve 1” into the Main On/Off
Valve.
10. Plug the connector labeled “Aux Valve 2” into the Auxiliary Valve
if the system is equipped with one.
Flow Control
Channel Cable
Auxiliary Valve
Harness