Innovation Water Heaters Installation, Operation & Maintenance Manual
CHAPTER 6 – MAINTENANCE
OMM-0078_0J
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
71
of
196
GF-128
Phone: 800-526-0288
PRI: 11/22/2013
CHAPTER 6. MAINTENANCE
6.1 MAINTENANCE SCHEDULE
The Innovation Water Heater requires regular routine maintenance to ensure continued reliable
operation throughout the service life of the unit. For optimum operation, AERCO recommends
that the following routine maintenance procedures be performed in the time periods specified in
Table 6-1.
Appendix I contains a list of the recommended spare parts for maintenance of the Innovation
Heater.
TO AVOID PERSONAL INJURY, PRIOR TO SERVICING ENSURE THAT
THE FOLLOWING GUIDELINES ARE STRICTLY OBSERVED:
•
DISCONNECT THE AC SUPPLY BY TURNING OFF THE SERVICE
SWITCH AND AC SUPPLY CIRCUIT BREAKER.
•
SHUT OFF THE GAS SUPPLY AT THE MANUAL SHUT-OFF VALVE
PROVIDED WITH THE UNIT
•
ALLOW THE UNIT TO COOL TO A SAFE WATER TEMPERATURE TO
PREVENT BURNING OR SCALDING
Table 6-1 - Maintenance Schedule
Section
Item
6 Mos.
12 Mos.
24 Mos.
Labor
Time
6.2
Igniter
(66023)
*Inspect
Inspect
Replace
15 mins.
6.3
Flame Detector
(66018)
*Inspect
Inspect
Replace
15 mins.
6.4
Combustion
Calibration
*Check
Check
1 hr.
6.5
Testing of
Safety Devices
Test
20 mins.
6.6
Fireside
Inspection
Inspect &
Clean
2 hrs.
6.7
Waterside
Inspection
*Inspect
Inspect
1 hr.
6.8
Heat Exchanger
Cleaning
Inspect &
Clean (as
required)
2 hrs.
6.9
Condensate
Drain Trap
*Inspect
Inspect &
Clean
30 mins.
6.10
Air Filter
(59138)
Clean or
Replace
5 mins.
*
Only performed after initial 6 month period after initial startup.
WARNING