- 28 -
TSE-N 10.00 A. B.
599 50 84 90
EN
20. Service-functions for assembly line
Assembly line test program:
-
Press program buttons S1 and S3 simultaneous and keep them pressed until the device is
switched ON by the ON/OFF switch S0.
-
For acknowledge, that the function assembly line test program is active, LED LD3 is
blinking.
This LED keeps on blinking during the whole program cycle.
-
The program starts automatically after 3 sec.
-
This specific assembly line program simulats a normal wash cycle and run analogus.
-
The program phase is displayed by PPD-LEDs LD9 to LD11
-
At least 3 seconds after power failure the full function is restarted.
-
The test program can be interrupted by opening the door.
-
During door open,the program LED LD3 is blinking and the related PPD-LED is ON.
-
The test program can only be terminated by an additional activation of button S3.
(See also description Delete program)
-
At the end of the test program, the LED LD3 is blinking and the PPD-LED End is ON.
-
In the assembly test program, the regeneration is run in any case, not only depending on
water consumption.
Adjust and recognise heating power:
-
The heating power is considered in the machine personalisation.
-
All machines equiped with EDW1000 will be build up with 10A heating element.
The assembly line test program takes approximately 16 minutes and proceeds as follows:
3URJUDP5XQ'LVSOD\
6WHS
)XQFWLRQ
7LPH
LED 9
1
static filling
up to level
2
dynamic filling
10 sec
3
pause
5 sec
4
dynamic filling
up to level + circulation pump with
increasing speed up to 1900 1/min
5
circulation pulse 2
heating
up to 50 °C
detergent dispenser
30 sec
LED 10
6
draining
30 sec
7
pause
20 sec
8
draining
10 sec
9
regeneration
120 sec
10
drain
30 sec
LED 11
11
End