- 17 -
TSE-N 10.00 A. B.
599 50 84 90
EN
10. Sequence draining with pressure switch level check
New draining with sequence draining
-
The draining step contains of 3 time sequences.
In the middle sequence, during time T2 the drain pump is stopped.
-
At the end of the drain step, the water level is checked.
-
If the switch back is reached, the drain step is terminated.
If the switch back isnt reached, the drain step is repeated.
-
A failure code is displayed, if after 2 drain steps, the switch back couldnt be reached.
In this case, the program is stopped and PPD-LED LD10 is blinking.
LD9
LD10
LD11
on
off
dr ain pump
T 2
(var iable)
T 3
(var iable)
T 1
(var iable)
1 dr aining s equence
with var iable timing
level check!
'UDLQ&\FOH
7
7
7
First draining before every wash cycle
45 sec
15 sec
20 sec
Draining after the wash cycles
30 sec
20 sec
10 sec