- 19 -
TSE-N 10.00 A. B.
599 50 84 90
EN
11. Installation of the Drain Hose
Drain hose connection:
Max. permissible height: 1 metre;
Min. height required 30 cm above floor level.
The drain hose can be extended horizontally to a maximum length of 3 metres, at a height of 85 cm.
12. Regeneration
The water chamber for regeneration (3) contains 350 ml water. During regeneration, the regeneration
valve (11) is energized. The 350 ml water runs into the salt container (9) and mixes with the salt to form
a brine solution.
In the top of the salt container there is an opening with a small filter, from here the brine solution passes
through a non-return valve (10) and enters the softener (8) where the resins are regenerated.
The softener has 5 settings and can be adjusted to suit the degree of water hardness.
The adjustment of the water hardness is described in the short list of service functions.
Table for water hardness adjustment
$GMXVWPHQW
:DWHU
KDUGQHVV
QXPEHURI
ZDWHUORDGV
2SHQLQJKRXUIRUUHJHQHUDWLRQ
YDOYH
WH 1
4 dH
60
180 Sek.
WH 2
18 dH
16
180 Sek.
WH 3
26 dH
8
180 Sek.
WH 4
32 dH
5
180 Sek.
WH 5
50 dH
0
180 Sek.
This table is stored in EEProm. Therefore the values are changeable
by variant configuration. The values on the left specify the actual status and shall only be seen as an
example for this documentation.
-
Column Number water loads contains the value, when the regeneration will be run.
o
With each dynamic filling step during the cycle, the counter is increased by 1.
A possible refilling is not taken into consideration.
o
If the value in the table, linked to the adjusted water hardness, is reached, the regeneration
is activated. At the water hardness WH5 regeneration is done each cycle.
o
In all DGN- and ZM45-machines, at the end of the program a 30 seconds draining of
regeneration water is run.