11.6 TEST PROCEDURE
The EUT and load were placed on a table, which was 0.1 meters high from a Ground reference
plane. Prior to the start of the test, a functional test was performed on the EUT to ensure proper
operation. The EUT was also monitored during the test for any degradation of performance. Also,
prior to the start of the test, clamp injection (RF current probe) calibration measurements were
performed as described in IEC 61000-4-6: 2003 + A1: 2004.
For AC Power line test & For Signal Lines and Control Lines test:
The disturbance signal is through a coupling and decoupling networks (CDN) or EM-clamp
device couples to the signal and control lines of the EUT.
After completion of the test, a functional test was performed on the EUT to ensure proper