Document Q101, Revision W
(Printout Uncontrolled)
Page 23 of 23
Q101 REVISION HISTORY
Revision
Date Revised
Author
Paragraph
Description
A 10/14/92
GF All
Initial
Release
B 12/23/92
GF All
Added
and
modified support document numbers and
titles.
C
12/04/93
GF
All
Changes support document numbers.
D
01/14/94
GF
4.1.2
Add, “is the management representative” to 1
st
line of
3
rd
par.
4.1.3
Added
quarterly management review of quality data.
4.19
Added last par. To include installation and
maintenance service.
All
Remove ref. To rev. from bottom of page.
E
01/24/95
GF
2.4, 4.2, 4.3, 4.4.6,
4.4.7, 4.14,
Revised to meet requirements of 1994 revision of
ANSI/ASQC Q9001.
F
06/15/95
GF
4.2.1
Added reference to customer and other organization
contributions.
G 03/11/96
GF
Attachment
1
Attachment 2
Updated the Quality Policy Statement and
Organization chart.
H 06/19/96
HT 2.3
Attachment 1
Attachment 2
Revised method of distribution for this manual.
Updated the Quality Policy Statement and
Organization Chart
J 05/21/97
CO 4.4.3
Revised Quality Policy (Attachment 1) Revised Org.
Chart (Attachment 2). Renumbered section 4.4.
K
06/11/99
CO
All
Revised to meet TL9000 requirements.
L
08/26/99
CO
4.1, 4.1.3, 4.3, 4.6.4,
4.6.5
Revised as result of NSAI audit dated 08/24/99.
M
07/00
CO
Revised as result of NSAI audit 07/00.
N 04/24/02
SJ All
Revised
to meet TL9000 3.0 (includes
ISO9000:2000). Also changed format.
P
09/16/02
SJ
2.0 and Planning
Add all elements of TL9000 to 2.0; add Top
Management’s requirements for establishing quality
objectives. Changed: operating procedures to work
instruction pg. 6, Design to Responsible pg. 11.
Added: business plans pg. 7, or designated individual
Pg. 13, maintained on the pg. 14.
R 06/12/03
EB
SJ
Numerous
Add reference to software. Add definitions and
Attachment 3 (Life Cycle Model). Remove
Attachment 1 (Q. Policy) use Q. Policy statement in
Manual.
T 12/19.05
SJ
Signature
Customer Related
Processes
Revised Officer signatures, revised org. chart, add Q
Policy as Attachment 1 and remove policy from.
Revised Customer Related Processes, Para 1, to
adequately describe contract review.
U 09/17/07
SJ
Numerous
Revised
Organizational Chart, added Compliance
Engineering procedure reference, added verbiage on
TL9000 4.0.
V 11/12/08
SJ
Numerous
Revised
Organizational Chart, included patching
W
05-05-09
SJ
Attachment I, II and
III, revised reference
to ISO9001:2008
Changed date of last review on Attachment I and II ,
Revised Attachment III to reflect SQE move to Ops
QA, revised reference to ISO9001:2008