2/2
C 100
Safety instructions for product use
GB 00745 - Edition 09 - Nov
. 11
Refer to the controller Operating manual to control and monitor the pump
(
chapter C). Refer to the controller Operating manual if a fault appears
(
D 200).
Standard precautions before any maintenance operations:
Before performing a maintenance operation, stop the pump. When the
pump is at rest, switch off the pump by setting the controller main switch
to «0», wait 5 minutes before disconnecting the main cable. If this last one
remains connected, some components will still be energized.
Be sure that the controller status is visible from the operator otherwise
disconnect the cable from the pump.
adixen Vacuum Products - Operating Instructions - ATP 2300 M