GB 00756 - Edition 15 - November 12
1/3
E 100
Shipping procedure
for contaminated pumps
Pumps to be shipped must initially be decontaminated then
pressurized with dry nitrogen (see procedure sheet 2/3).
Closing kits including O-ring, screws and nuts, inlet blank flange and
hoisting rings can be supplied upon order.
*Closing
kit
DN 200
ISO-F
DN 250
ISO-F
DN 320
ISO-F
P/N
108496
108497
114503
* depends on the pump
*** Standard connection accessories available in the product catalog.
Description
DN 40
DN 50**
Centering ring
with seal
068194
087164
DN 40
Clamping ring
083267
087163
Blank-off
flange
068197
087162
** DN 50 ISO KF
(if available ordered in ordering guide)
B
Exhaust port
DN 40 - ISO-KF
DN16 - ISO KF
1/4 VCR
Centering ring
with DN 16 seal
068193
Seal
076705
DN 16 clamping
ring
083333
Fitting 1/4 VCR
female
108500
C
*** Purge port
A
B
C
D
Whenever you return the product to an repair service center, please make sure
you follow the Service procedure and fill in the declaration of contamination
found on our website.
Study the safety instructions related to preventive maintenance
D 100.
A
Inlet port
Risk of injury by cutting.
Contact with the pump rotor cell may cause cuts. Alternatively, protective
gloves may be worn when servicing the product.
Connecting ports
The user must stick this label on the product to warn against
pumped process gas that could be dangerous and toxic and could
cause severe injuries or death. It precises that any preventive
maintenance operation can only be performed by trained
personnel.
FLAMMABLE, CORROSIVE AND TOXIC
CHEMICALS LOCATED WHITHIN THE ENCLOSURE
Explosure may result in severe injury
or death.
Preventive maintenance must be done
by trained personnel only.
WARNING
adixen Vacuum Products - Operating Instructions - ATP 2300 M