
|
|
P a g e
P a g e
© Adam Equipment Company 2010
© Adam Equipment Company 2010
3.2
3.2
ASSEMBLING
ASSEMBLING
THE
THE
ANALYZER
ANALYZER
For best performance, let the analyzer warm up for 30 minutes before using.
For best performance, let the analyzer warm up for 30 minutes before using.
Locate the PMB on a solid
Locate the PMB on a solid
surface, free from vibration with
surface, free from vibration with
good ventilation around it.
good ventilation around it.
Place the lower reflector (1)
Place the lower reflector (1)
into the base of the weighing
into the base of the weighing
chamber
chamber
Gently place the pan support
Gently place the pan support
(2) into the access hole. Rotate
(2) into the access hole. Rotate
to position.
to position.
Place
Place the
the sample pan
sample pan lifter (3)
lifter (3)
into the weighing chamber,
into the weighing chamber,
rotate so the tangs on the lifter
rotate so the tangs on the lifter
do not interfere with the pan
do not interfere with the pan
supports and the handle exits
supports and the handle exits
the chamber using one of the
the chamber using one of the
gaps in the cover.
gaps in the cover.
Place
Place an
an empty
empty aluminium
aluminium
weighing tray (4) on the pan
weighing tray (4) on the pan
support
support
Level
Level the
the PMB
PMB using
using the
the
adjustable feet and spirit level
adjustable feet and spirit level
For some applications
For some applications it is desirable to run
it is desirable to run the analyzer in
the analyzer in a dummy
a dummy run to
run to
warm up the weighing chamber and the surrounding area before doing the
warm up the weighing chamber and the surrounding area before doing the
actual test. See section
actual test. See section 14
14 for other ideas
for other ideas to help ensure
to help ensure accurate test
accurate test
results.
results.
Summary of Contents for PMB
Page 4: ...P a g e P a g e Adam Equipment Company 2010 Adam Equipment Company 2010...
Page 6: ...P a g e P a g e Adam Equipment Company 2010 Adam Equipment Company 2010...
Page 68: ...P a g e P a g e Adam Equipment Company 2010 Adam Equipment Company 2010...
Page 78: ...P a g e P a g e Adam Equipment Company 2010 Adam Equipment Company 2010...
Page 80: ...P a g e P a g e Adam Equipment Company 2010 Adam Equipment Company 2010...
Page 82: ...P a g e P a g e Adam Equipment Company 2010 Adam Equipment Company 2010...