
i
The dead rope must never be loaded (in order to avoid
side loading on the Rope Guide).
Do not build tramways
using the primary rope as shown in the picture.
Stop immediately when a rope twist is observed, untwist
and organise the rope before continuing.
CAUTION
When descending, make sure the rope is fed neatly into
the Rope Grab so that there are no kinks or twists in the
rope. Take special care when using long ropes to prevent
twists or kinks. Good rope management is ESSENTIAL.
RECOMMENDATION
When descending, hold the rope entering the Ascender
to prevent it from running twisted into the Ascender.
50
Summary of Contents for ACX
Page 2: ......
Page 3: ......
Page 15: ...C ROPE Rope type and preparation C 01 15 ...
Page 18: ......
Page 21: ......
Page 25: ...Top Rigged Basic setup Bottom Rigged Basic Setup Double load 25 ...
Page 26: ...Pulley Expert use only Pulley Expert use only ACX pulley rigging on a single anchor 26 ...
Page 42: ......
Page 64: ......
Page 65: ...H POWER ASCENDERS WARRANTY TERMS Warranty terms H 01 65 ...
Page 68: ......
Page 69: ...I TECHNICAL DATA Technical data 1 01 69 ...
Page 71: ...Initial delivery A Inspection B Replaced consumables C Usage log D LOGBOOK 71 ...
Page 77: ...D USAGE LOG Date Signature Comment 77 ...
Page 78: ...D USAGE LOG Date Signature Comment 78 ...
Page 79: ...79 ...