
i
D.04
PERSONNEL
LIFTING SETUP
Displayed here are the four standard
personnel lifting setups that are
suitable for use with the ACX Ascender.
They are shown for illustration
purposes only. For further guidance,
please contact your local ActSafe
supplier or ActSafe directly.
CAUTION
Always hold the unloaded rope when
the Ascender is rigged to an anchor.
RECOMMENDATION
Use different color ropes for different
rope systems to improve safety.
Active / Running
Basic setup
24
Summary of Contents for ACX
Page 2: ......
Page 3: ......
Page 15: ...C ROPE Rope type and preparation C 01 15 ...
Page 18: ......
Page 21: ......
Page 25: ...Top Rigged Basic setup Bottom Rigged Basic Setup Double load 25 ...
Page 26: ...Pulley Expert use only Pulley Expert use only ACX pulley rigging on a single anchor 26 ...
Page 42: ......
Page 64: ......
Page 65: ...H POWER ASCENDERS WARRANTY TERMS Warranty terms H 01 65 ...
Page 68: ......
Page 69: ...I TECHNICAL DATA Technical data 1 01 69 ...
Page 71: ...Initial delivery A Inspection B Replaced consumables C Usage log D LOGBOOK 71 ...
Page 77: ...D USAGE LOG Date Signature Comment 77 ...
Page 78: ...D USAGE LOG Date Signature Comment 78 ...
Page 79: ...79 ...