Page
10
of
125
3 Initial Set Up
Step 1
Connect tool cable to Tool Connector. Cable consists of a male pin set housed in a
molded 19 pin connector with a polarizing notch. Align tool cable notch with tool
connector notch on the controller and insert cable. Securely thread connector
coupler to controller body.
Step 2
Repeat above process to connect tool cable to AcraDyne tool being used with the
controller.
Step 3
Plug female end of power cable into Power Cable Connector.
Step 4
Plug male end of power cable into appropriate power source.
Due to a variety of 230Vac power outlets, the standard power cable plug-end provided with
the controller
may
need to be modified in order to connect to local 230Vac power outlets.
AcraDyne has a wide variety of country specific power cord options available. Check with your
authorized AcraDyne representatives to see if your specific configuration is available. In any
case, connection to local power should be made in consultation with a qualified electrician.
Step 5
The Secondary Protective Earth Attachment (it is required) must be connected to
ground using the #14 AWG conductor, a green wire with a yellow stripe. Attach using a
#10-14AWG ring terminal and #10 star washer (see below).
1
1—Secondary Protective Earth Attachment
Step 6
Turn controller on by pushing the Power Disconnect Switch to the POWER ON position, a
light indicates power on.
NOTE:
Warning will appear if the controller is power cycled too
quickly. If fault appears, Power Down controller, wait a
mimimum of 10 seconds between controller Power Down and
Power Up to clear error and restart controller.