Attaching the Power Cord
ARX®1000 Hardware Installation Guide
5 - 7
Attaching the Power Cord
Locate the power ON/OFF toggle switch on the back of the switch and
ensure it is set to the OFF position.
DANGER
In the event that AC power must be removed from the system, disconnect the
power cord before servicing the unit to avoid electric shock.
Figure 5.3
ON/OFF Power Switch (Rear View)
See Power Cord and Cable Requirements, on page 4-5 for power cord and
cable specifications.
Powering Up the Switch
WARNING
Before applying power, ensure that the AC outlet to the switch is properly
grounded.
To power up the switch, turn the ON/OFF toggle switch(es) to the ON
position.
Cabling
You can cable the client/server ports before or after the switch is connected
to the network.
Ethernet cables are supplied by the customer. For cable specifications and
requirements, see Power Cord and Cable Requirements, on page 4-5. For
cable connector and pinout information, see Cable Connectors and Pinouts,
on page 4-6.
Summary of Contents for ARX 1000
Page 1: ...ARX 1000 Hardware Installation Guide version 4 01 001 810 0006 00 ...
Page 2: ......
Page 5: ...Table of Contents ...
Page 6: ......
Page 9: ......
Page 10: ...Table of Contents x ...
Page 12: ......
Page 22: ......
Page 28: ......
Page 34: ......
Page 42: ......
Page 48: ...Chapter 5 5 8 ...
Page 50: ......
Page 62: ...Chapter 6 6 14 ...
Page 64: ......
Page 70: ......
Page 74: ...Appendix A A 6 ...
Page 75: ...Index ...
Page 76: ......