25
Testing the System
1. After running for a few minutes, f
ill a glass with water from the system’s
output. The water should be saturated with bubbles and become clear in
20 to 30 seconds (depending on glass size).
2.
Observe the system’s reaction to water being turned on and off at the
destination site. The system should begin operating a few seconds after
water use begins, and stop operating between 10-30 seconds after water
use has ceased.
3. Examine the system and all associated equipment, including the filters, for
leaks and to ensure proper operation.
4. Collect water samples. See
Water Sampling Instructions
from the lab to be
submitted to and submit samples to an accredited laboratory for analysis.
5. Record all site specific information of the situation and installation.
6. NOTE: System should start within a few seconds of water flowing from a tap
and run up to 30seconds after the tap is stopped. This is for optimal
treatment, contact Aclarus for more information if required.
Dealer NOTES:
Consult with the client regarding the system operations and completion of the
installation. Confirm submission of water samples.
Review warranty and maintenance policies and requirements with the client.
Ensure the serial numbers and information is filled out on page 8 in this
manual.
Summary of Contents for AOWT-7
Page 9: ...9 System Components...
Page 10: ...10 NOTE System components and tank may not be exactly as shown...
Page 47: ...47 Appendix Component Specification Sheets Pumps Specifications...
Page 48: ...48...
Page 49: ...49...
Page 50: ...50 Flow Switch Specifications...
Page 51: ...51...
Page 52: ...52 Mazzei Specifications...
Page 53: ...53 Gas Off 1 Specifications...