27
4
Place the server on a flat, stable surface.
5
Open the server according to the instructions on page 41.
6
Follow the ESD precautions described in the previous section when
handling a server component.
Post-installation instructions
Perform the steps below after installing a server component.
1
See to it that all components are installed according to the
described step-by-step instructions.
2
Reinstall any expansion board(s), peripheral(s), bracket(s) and
system cable(s) that have previously been removed.
3
Reinstall the side panel.
4
Reconnect the power, peripheral, and telecommunication cables.
5
Turn on the system.
Summary of Contents for AT350 F1 Series
Page 1: ...AT350 F1 Series User Guide ...
Page 12: ...xii ...
Page 13: ...1 System tour ...
Page 15: ...3 External and internal structure Front panel With 3 5 inch HDD bays ...
Page 29: ...2 System setup ...
Page 37: ...3 System upgrades ...
Page 79: ...4 System BIOS ...
Page 117: ...5 System troubleshooting ...
Page 127: ...Appendix A Server management tools ...
Page 138: ...Appendix A Server management tools 126 ...
Page 139: ...Appendix B Rack mount configuration ...
Page 150: ...Appendix B Rack mount configuration 138 ...
Page 151: ...Appendix C Acer Smart Console ...
Page 180: ...Appendix C Acer Smart Console 168 ...
Page 184: ...172 ...