Machine Maintenance Procedures
3-37
RTC Battery Removal
0
Prerequisite:
Mainboard Shielding Removal
1.
Lift battery (A) from opening (B) on mainboard connector (C). (Figure 3-34)
Figure 3-34.
RTC Battery
2.
Remove battery from mainboard connector.
NOTE:
NOTE
:
Follow local regulations for battery disposal.
RTC Battery Installation
0
1.
Install battery (A) into mainboard connector (C). (Figure 3-34)
2.
Press down to secure.
3.
Install lower logic door.
C
A
B
C
Summary of Contents for Aspire Z1100
Page 1: ...i SERVICE GUIDE Aspire Z1100 ...
Page 10: ...x ...
Page 11: ...CHAPTER 1 Hardware Specifications ...
Page 14: ...1 4 ...
Page 42: ...1 32 Hardware Specifications and Configurations ...
Page 43: ...Hardware Specifications and Configurations 1 33 ...
Page 44: ...1 34 Hardware Specifications and Configurations ...
Page 45: ...CHAPTER 2 System Utilities ...
Page 70: ...2 26 System Utilities ...
Page 71: ...CHAPTER 3 Machine Maintenance Procedures ...
Page 74: ...3 4 ...
Page 126: ...3 56 Machine Maintenance Procedures ...
Page 127: ...CHAPTER 4 Troubleshooting ...
Page 149: ...CHAPTER 5 Jumper and Connector Locations ...
Page 156: ...5 8 Jumper and Connector Locations ...
Page 157: ...CHAPTER 6 FRU Field Replaceable Unit List ...
Page 158: ...6 2 Exploded Diagrams 6 4 Main Assembly 6 4 FRU List 6 6 Screw List 6 13 ...
Page 170: ...6 14 FRU Field Replaceable Unit List ...
Page 171: ...CHAPTER 7 Online Support Information ...
Page 172: ...7 2 Introduction 7 3 ...
Page 174: ...7 4 Online Support Information ...