Machine Maintenance Procedures
3-17
Change Board Removal
0
Prerequisite:
Back cover Removal
1.
Locate change board (A) on middle frame. (Figure 3-11)
Figure 3-11.
Change Board
2.
Disconnect the following cables:
Change board FFC (C) from change board connector (B)
Change board FFC (D) from change board connector (E)
3.
Remove converter board from adhesive on middle frame.
Change Board Installation
0
1.
Install change board (A) to adhesive on middle frame. (Figure 3-11)
2.
Connect the following cable:
Change board FFC (C) to change board connector (B)
Change board FFC (D) to change board connector (E)
3.
Install back cover.
A
B
C
D
E
Summary of Contents for Aspire Z1100
Page 1: ...i SERVICE GUIDE Aspire Z1100 ...
Page 10: ...x ...
Page 11: ...CHAPTER 1 Hardware Specifications ...
Page 14: ...1 4 ...
Page 42: ...1 32 Hardware Specifications and Configurations ...
Page 43: ...Hardware Specifications and Configurations 1 33 ...
Page 44: ...1 34 Hardware Specifications and Configurations ...
Page 45: ...CHAPTER 2 System Utilities ...
Page 70: ...2 26 System Utilities ...
Page 71: ...CHAPTER 3 Machine Maintenance Procedures ...
Page 74: ...3 4 ...
Page 126: ...3 56 Machine Maintenance Procedures ...
Page 127: ...CHAPTER 4 Troubleshooting ...
Page 149: ...CHAPTER 5 Jumper and Connector Locations ...
Page 156: ...5 8 Jumper and Connector Locations ...
Page 157: ...CHAPTER 6 FRU Field Replaceable Unit List ...
Page 158: ...6 2 Exploded Diagrams 6 4 Main Assembly 6 4 FRU List 6 6 Screw List 6 13 ...
Page 170: ...6 14 FRU Field Replaceable Unit List ...
Page 171: ...CHAPTER 7 Online Support Information ...
Page 172: ...7 2 Introduction 7 3 ...
Page 174: ...7 4 Online Support Information ...