3-16
Machine Maintenance Procedures
Converter Board Removal
0
Prerequisite:
Back cover Removal
1.
Locate converter board (A) on middle frame. (Figure 3-10)
Figure 3-10.
Converter Board
2.
Disconnect the following cables:
Converter cable (B) from converter board connector (D)
Change board FFC (E) from converter board connector (F)
3.
Remove screws (C) from middle frame.
4.
Remove converter board.
Converter Board Installation
0
1.
Install converter board (A) to middle frame. (Figure 3-10)
2.
Install and secure screws (C) to middle frame.
3.
Connect the following cable:
Converter cable (B) to converter board connector (D)
Change board FFC (E) to converter board connector (F)
4.
Install back cover.
ID
Size
Quantity
Screw Type
C
M3.0x5.0
2
A
B
C
D
C
E
F
Summary of Contents for Aspire Z1100
Page 1: ...i SERVICE GUIDE Aspire Z1100 ...
Page 10: ...x ...
Page 11: ...CHAPTER 1 Hardware Specifications ...
Page 14: ...1 4 ...
Page 42: ...1 32 Hardware Specifications and Configurations ...
Page 43: ...Hardware Specifications and Configurations 1 33 ...
Page 44: ...1 34 Hardware Specifications and Configurations ...
Page 45: ...CHAPTER 2 System Utilities ...
Page 70: ...2 26 System Utilities ...
Page 71: ...CHAPTER 3 Machine Maintenance Procedures ...
Page 74: ...3 4 ...
Page 126: ...3 56 Machine Maintenance Procedures ...
Page 127: ...CHAPTER 4 Troubleshooting ...
Page 149: ...CHAPTER 5 Jumper and Connector Locations ...
Page 156: ...5 8 Jumper and Connector Locations ...
Page 157: ...CHAPTER 6 FRU Field Replaceable Unit List ...
Page 158: ...6 2 Exploded Diagrams 6 4 Main Assembly 6 4 FRU List 6 6 Screw List 6 13 ...
Page 170: ...6 14 FRU Field Replaceable Unit List ...
Page 171: ...CHAPTER 7 Online Support Information ...
Page 172: ...7 2 Introduction 7 3 ...
Page 174: ...7 4 Online Support Information ...