45
Ventilation
: The equipment rack must provide sufficient airflow
to the front of the server to maintain proper cooling. It must also
include ventilation sufficient to exhaust a maximum of 2110 Btu's
per hour for a fully loaded Altos R700 server.
It is important to note that this is the maximum, and a minimum
or typical system could be much less. You may want to calculate
the BTU/hr more accurately for your configuration. An extra 500
BTU/hr over many systems would translate into a large error
calculating air conditioning capacity.
AR700-e.book Page 45 Tuesday, September 10, 2002 2:31 PM
Summary of Contents for Altos R700 Series
Page 1: ...Altos R700 Chassis Subassembly Product guide...
Page 9: ...1 Chassis Description...
Page 22: ...1 Chassis Description 14...
Page 23: ...2 Assembling the System...
Page 51: ...3 Installing the System in a Rack...
Page 54: ...3 Installing the System in a Rack 46...
Page 55: ...4 Working Inside Your Server...
Page 75: ...Appendix A Equipment Log and Worksheets...
Page 77: ...69 DAT TApe Drive Item Manufacturer Name and Model Name Serial Number Date Installed...