Accu-Steam™ Gas G2 Installation and Operators Manual
MP5017-1702
PAGE 37
PM DESCRIPTION
GENERAL
ITEMS
BIANNUAL
ITEMS
ANNUAL
ITEMS
Verify that the appliance is level and properly located under the
hood.
X
X
Verify that the temperature controller is working properly and that
there are no rips in the overlay.
X
X
X
Check that the splash shield at the top of the control panel
is under the rail provided. If not water and or grease can
migrate and cause possible damage to the internal electronic
components.
X
X
Inspect the control compartment for foreign particulate and any
loose wiring connections.
X
X
A back draft diverter has been installed at the factory this will
keep scraping from spatulas from dropping down the flue and will
provide addition protection from back drafts that can effect stand-
by burner operation. Check that flue has not been pushed in
resulting in an uneven opening across the flue passage. Pull flue
out so that flue opening is even across width of appliance.
X
X
Verify the operation and condition of the igniter and flame sense
probe assembly. Probes should be cleaned with a wire brush
and/or emery cloth.
Caution: DO NOT use any abrasive that
contains aluminum oxide. This will leave a coating on the
flame sensor that could cause the unit not to light.
X
X
Clean all buner orifices, making sure that each orifice is clear and
unobstructed. It may be necessary to a drill the same size of the
orifice, if very soiled.
X
X
Inspect the burner venturi tubes for foreign particulate. Wipe out
with a mild detergent and warm water and rinse with clean water.
X
X
Inspect combustion chamber and the burner tiles. If water stains
are present on tiles check that tiles have no cracks and haven’t
sunk into the burner. Replace burners if this condition is present.
X
Inspect the ignition wire harness for any evidence of high
temperature degradation or grease build-up on harness
connector. Spray contact cleaner into white connector and clean
mating connector imbedded in ignition module. Coat the pins with
a dielectric grease.
X
X
Verify main burner regulator pressures are correct.
X
X
Verify flame sense operation
X
X
It is recommended that you contact your Accutemp authorized service provider to
setup a planned maintenance program to keep your appliance operating in the most
efficient manner. Accutemp recommends a minimum of a yearly schedule.
NOTE
Summary of Contents for GG24A
Page 2: ......
Page 4: ......
Page 6: ......
Page 10: ......
Page 14: ......
Page 16: ......
Page 29: ...Accu Steam Gas G2 Installation and Operators Manual MP5017 1702 PAGE 22 OPERATION ...
Page 50: ......
Page 54: ......
Page 55: ...Accu Steam Gas G2 Installation and Operators Manual MP5017 1702 PAGE 46 NOTES ...
Page 56: ......