Service and Maintenance
Note:
Only professional technicians are allowed to service the
converters. Prior to conducting this work, AC and DC power
sources must completely break off from the converters to
avoid electrical hazards.
To ensure the normal operation of the converter, please inspect the
converter every six months. The inspection includes:
1.
Confirm that there are no objects piled on top of the converter
2.
Professional technicians need to clean the dust off the converter
body and the radiating fins
3.
Check all wiring and terminals to confirm that they are not loose or
eroded
4.
Check if the power supply cable is damaged
5.
Confirm that the venting outlet is not blocked by objects and clean
the dust
6.
Professional technicians need to remove the fan frame, and clean
away dust or objects
7.
Check if the surge protection device is damaged
Summary of Contents for EnerSolis Series
Page 1: ...Ablerex Grid Connected Solar Converter EnerSolis Series ES 52000HC ES 60000HC User Manual ...
Page 4: ...3 ...
Page 9: ...8 8 AC output Transmits AC power generated from the inverter to the mains ...
Page 16: ...15 抓握處 Handles ...
Page 24: ...23 Figure 2 ...
Page 27: ...26 Figure 6 Figure 4 Figure 5 ...
Page 42: ...41 ...
Page 49: ...48 the RS485 port of the cloud module please refer to 6 1 Communication Interface ...
Page 51: ...50 ...
Page 54: ...53 ...
Page 56: ...55 ...
Page 60: ...59 confirm whether there is an input error ...