36
the converter, after about 30 second, the yellow LED will turn off,
and the converter will start the on-grid power generation
procedure. If the grid specifications do not meet the requirements
of the converter, the yellow LED will start flashing.
Step 3: During on-grid power generation, the converter will automatically
execute the procedure, and the green LED will be flashing.
Step 4: If errors occur during the operation of the converter (such as
output current too high), the red LED will start flashing. Please
contact Ablerex or the local retailer for assistance and
troubleshooting in such case.
Step 5: When the converter completes the on-grid power generation
procedure, the green LED will light up permanently, and the
converter under normal operation.
Summary of Contents for EnerSolis Series
Page 1: ...Ablerex Grid Connected Solar Converter EnerSolis Series ES 52000HC ES 60000HC User Manual ...
Page 4: ...3 ...
Page 9: ...8 8 AC output Transmits AC power generated from the inverter to the mains ...
Page 16: ...15 抓握處 Handles ...
Page 24: ...23 Figure 2 ...
Page 27: ...26 Figure 6 Figure 4 Figure 5 ...
Page 42: ...41 ...
Page 49: ...48 the RS485 port of the cloud module please refer to 6 1 Communication Interface ...
Page 51: ...50 ...
Page 54: ...53 ...
Page 56: ...55 ...
Page 60: ...59 confirm whether there is an input error ...