Ze nit h Z T X S e r i e s AT S , O PER ATI O N , M A I NTEN A N CE , A N D I N S TA LL ATI O N G U I D E
—
2.5 Sequence of Operations
2.5.1 Switching sequence / Automatic
2.5.1.1 SOURCE 1 Priority
(SOURCE 2 = Generator)
The switching sequence can be
summarized in the following steps:
• An anomaly occurs on SOURCE 1
• Override momentary S1 outage delay
• Generator start
• SOURCE 2 OK
• Transfer from S1 to S2 delay
• Transfer switch (SOURCE 2) to
position II
The re-transfer sequence can be
summarized in the following steps:
• SOURCE 1 is restored
• Transfer from S2 to S1 delay
• Transfer switch (SOURCE 1) to
position I
• Generator stop delay
• Generator stop
• SOURCE 2 off
Summary of Contents for Zenith ZTX Series
Page 2: ...2 ...
Page 6: ...6 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Page 10: ...10 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Page 34: ...34 1 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 50: ...50 1 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE Figure A Figure B ...
Page 51: ...51 1 Figure C ...
Page 52: ...52 1 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 54: ...2 54 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 66: ...2 66 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 70: ...2 70 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...