2
1
—
Receiving, handling and storage
Receiving and handling
Upon receipt, carefully inspect the trans-
fer switch for damage that may have oc-
curred during transit. If damage is evi-
dent, or there is visible indication of
rough handling, immediately file a dam-
age claim with the transportation com-
pany, and notify your local ABB sales
office.
Do not remove the shipping packaging
until ready to install the switch.
Storage
If the unit will not be placed into service
immediately, store the transfer switch in
its original package in a clean, dry loca-
tion. To prevent condensation, maintain a
uniform temperature. Store the unit in a
heated building, allowing adequate air cir-
culation and protection from dirt and
moisture. Storing the unit outdoors could
cause harmful condensation inside the
transfer switch enclosure.
HAZARD OF EQUIPMENT
OVERTURNING
When moving with a fork lift, do not re-
move the shipping packaging until the de-
vice is in its final location.
Failure to follow this instruction may
result in personal injury or equipment
damage.
Warning
Indicates a hazardous situation that,
if not avoided, could result in death or
serious injury.
Summary of Contents for Zenith ZTX Series
Page 2: ...2 ...
Page 6: ...6 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Page 10: ...10 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Page 34: ...34 1 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 50: ...50 1 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE Figure A Figure B ...
Page 51: ...51 1 Figure C ...
Page 52: ...52 1 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 54: ...2 54 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 66: ...2 66 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Page 70: ...2 70 Zenith ZTX Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...