Operation Manual / 4 Product description / TPS44-H.. - TPS52-H..
3
Commissioning
Page 21 / 99
© Copyright 2016 ABB. All rights reserved.
HZTL4037_EN
Revision A
August 2016
Version with water-cooled bearing casing
CAUTION
Failure of bearing casing cooling
Any prolonged failure of the water cooling will shorten the lifetime of the tur-
bocharger.
Make sure that an uninterrupted supply of cooling water is provided during
operation.
Check whether the water pipes are fitted on the bearing casing.
3.2.3
Checks after commissioning (engine in idle mode)
Lubricating system
Keep to the lubricating oil pressure at the inlet.
Keep to the lubricating oil temperature at the inlet.
23] for admissible values.
Tightness of pipes
Check all the pipes for tightness.
3.2.4
Checks when starting up the engine
Measure speed, oil pressure and charging pressure at various engine performances.
Measure the exhaust gas temperature before and after the turbine.
Measure the air temperature before and after the compressor.
Compare the measured values with the values of the acceptance certificate. Different op-
erating conditions indicate a malfunction (see chapter
NOTICE
Escape of oily fluids
Lubricants and pastes used during assembly can liquefy or vaporise and es-
cape as oily fluids during the initial hours of operation. Continuous escape of
an oily fluid indicates an oil leak.
If there is a leak, contact an ABB Turbocharging Service Station.