Introduction
The startup guide is designed for typical installations only. Installations must be performed
by personnel knowledgeable of the Remote Modular Controller 100, local and national
codes, communication wiring, and electrical wiring. Many sites have unique system
installation requirements. In these cases it is important to reference site-specific
documentation.
In this startup guide, the Remote Modular Controller 100 will be referred to as the RMC or
the controller, unless otherwise indicated.
WARNING – Bodily injury/ equipment damage.
Although there may
be alternate methods of installation and commissioning of the RMC, it
is recommended that technicians perform the procedures in the
presented order: plan, install, wire before applying power, apply power,
verify power-on sequence, and configure.
WARNING – Bodily injury.
The RMC-100 startup guide does not
address any requirements for the installation of product(s) in hazardous
(classified) locations. Refer to the installation instructions and local and
national electrical codes for installation requirements in hazardous
(classified) locations.
Startup guide
Remote Modular Controller
RMC-100