7. Commissioning
7.1. Required qualification
7.2. Commissioning procedure
7.3. Commissioning checklist
7.4. Customer assistance
7.5. Customer acceptance
Commissioning, parameter adjustments and functional tests must be carried out
only by qualified commissioning personnel that have been certified by ABB.
Information on the commissioning procedure and the start conditions for
commissioning can be obtained from ABB.
In order to ensure uncomplicated and speedy commissioning, it is important that
converter and associated equipment are ready for commissioning. Reviewing and
completing the items in the commissioning checklist before the commissioning
personnel arrive on site will help to achieve this.
During the commissioning period, the customer is requested to provide qualified
personnel for assistance, who are:
– Experienced with medium and low voltage equipment and with the local
safety regulations,
– Familiar with the driven process
– Authorized to operate associated medium and low voltage equipment (eg,
input circuit breaker, other low and medium voltage switchgear)
– Authorized to operate the driven process for functional tests
When commissioning has been completed, the commissioning report is signed by
the responsible commissioning personnel and by the customer as a sign of
acceptance. A copy of the report and a copy of the actual parameter settings are
handed out to the customer.