![ABB IRB 7600 - 150/3.5 Product Manual Download Page 359](http://html.mh-extra.com/html/abb/irb-7600-150-3-5/irb-7600-150-3-5_product-manual_5081359.webp)
4 Repair
4.7.4. Replacement of gearbox, axis 4
357
3HAC022033-001 Revision: E
©
Co
py
rig
h
t 200
4 - 20
08 ABB.
All r
ig
h
ts r
e
se
rv
ed
.
Refitting, gearbox axis 4
The procedure below details how to refit the gearbox of axis 4.
6. Loosen the
gear attachment screws
but do not
remove the gear Z3.
Shown in the figure
7. Remove the motor, axis 4.
Detailed in section
.
8. Remove
gear Z3
from the gearbox by unscrewing the
15
gear attachment screws
.
If required, insert screws into three holes in gear Z3
to press it out.
Shown in the figure
9. Remove the
motor flange attachment screws
and
plain washers.
Shown in the figure
10. Pull the motor flange and gearbox, axis 4 out along
with the friction washers.
If required, insert screws into two holes in the gearbox
to press it out.
M10.
Action
Note
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the air
pressure to motors and SMB.
2. Make sure the two
o-rings
on the circumference
of the gearbox are seated properly in their
grooves respectively. Lightly lubricate the
o-
rings
with
grease.
Art. no. is specified in
3. Lubricate the gearbox, motor and motor
attachment mating surfaces with
grease.
Art. no. is specified in
4. Fit four
guide pins
symmetrically in the
attachment holes in the upper arm housing.
xx0200000067
A. Attachment holes for guide
pins, M10
Art. no. is specified in
Continued
Continues on next page