2 Installation and commissioning
2.6.5. Installation of position switches (option)
115
3HAC022033-001 Revision: E
©
Co
py
rig
h
t 200
4 - 20
08 ABB.
All r
ig
h
ts r
e
se
rv
ed
.
Installation of cable harness for position switches and fans
The procedure below details how to fit the complete cable harness for position switches and
cooling fans to the robot.
R3.FAN3
Connected to the fan of axis 3
R2.SW2
Connected to the position switch of axis 2
R2.SW3
Connected to the position switch of axis 3
Action
Note
1. Move the robot to its calibration position.
2.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off
the air pressure to motors and SMB.
3. Remove the rear cover (A) from the robot
base and replace the protection (B) with a
plate for customer connections (if not
already mounted).
xx0500002306
Art. no. for the plate is specified in
Required equipment on page 108
4. Run the cabling through the base and
frame of the robot, up beneath the
balancing device.
Continued
Continues on next page