![ABB IRB 7600 - 150/3.5 Product Manual Download Page 311](http://html.mh-extra.com/html/abb/irb-7600-150-3-5/irb-7600-150-3-5_product-manual_5081311.webp)
4 Repair
4.6.2. Replacement of motor axis 2
309
3HAC022033-001 Revision: E
©
Co
py
rig
h
t 200
4 - 20
08 ABB.
All r
ig
h
ts r
e
se
rv
ed
.
8.
DANGER!
Secure the weight of the lower arm properly
before releasing the brakes of motor, axis 2!
When releasing the holding brakes of the motor,
the lower arm will be movable and may fall down!
9. After the weight of the lower arm is properly
secured, continue removal of the motor unit, as
detailed in section
.
10. Fill the four screw recesses on the new motor with
Sikaflex. (After hardening, Sikaflex can be formed
with a knife)
xx0600002875
•
A: Motor unit
•
B: Sikaflex in screw
recesses
11. Continue to refit the new motor according to
.
12. Perform a leak test according to
hoses (Foundry Prime) on page 176
Action
Note
Continued