2 Installation and commissioning
2.5.7. Securing the base plate
81
3HAC022033-001 Revision: E
©
Co
py
rig
h
t 200
4 - 20
08 ABB.
All r
ig
h
ts r
e
se
rv
ed
.
Base plate, grooves and holes
The illustration below shows the orienting grooves and guide sleeve holes in the base plate.
xx0300000045
Required equipment
A
Guide sleeve holes (2 pcs)
B
Orienting grooves (3 pcs)
C
Levelling bolts, attachment holes (4 pcs)
Equipment
Art. no.
Note
Base plate
3HAC12937-7
Includes
•
guide sleeves, 3HAC2937-3
•
levelling screws, 9ADA120-79
•
attachment screws and
washers for securing the robot
to the base plate.
A drawing of the base plate itself may
be ordered from ABB Robotics!
Standard toolkit
-
The content is defined in section
Other tools and procedures may
be required. See references to
these procedures in the step-by-
step instructions below.
These procedures include references
to the tools required.
Continued
Continues on next page