21
– 27
- General electrical installation procedure
- Insert the AC input conduit
- Insert the AC input cable and Install the
cold-pressed terminal for PE
- Install the mechanical lugs for L1, L2,
option 1
- Install the cold-pressed terminal for
L1, L2, option 2
- Connect the AC input wires
- Insert the Ethernet conduit
- Insert and connect the Ethernet cable
- Insert the smart meter communication
conduit
- Insert and connect the wires for the
smart meter communication
- Insert the Nano-M2M SIM card
- Rotary switch set current limit
28
- General commissioning procedure
- Energize the EVSE
- Set up the EVSE
- TerraConfig app to do the
commissioning
29
– 31
- Troubleshooting procedure
- Troubleshooting table
- De-energize the EVSE
32
– 36