![ABB InCharge Terra AL2-40-240-T1-WC1R Installation Manual Download Page 17](http://html1.mh-extra.com/html/abb/incharge-terra-al2-40-240-t1-wc1r/incharge-terra-al2-40-240-t1-wc1r_installation-manual_4343781017.webp)
15
—
Internal components
A
P
B
F
C
G
D
H
E
L
I
M
J
N
K
O
Label
Part
Label
Part
A
Maintenance cover
I
AC input L1
B
Rotary switch set current limit
J
AC input L2
C
Nano-M2M SIM card slot
K
AC input PE
D
Primary Ethernet port RJ45
L
Charge cable L1
E
Secondary Ethernet port RJ45
M
Charge cable L2
F
Configurable output contact
N
Charge cable PE
G
Configurable input contact
O
Charge cable with strain relief
H
Modbus RTU (RS-485)
P
Display
Load management
Load management makes sure that the available capacity of
the building or home is not exceeded. A number of devices
share a grid connection, that has a maximum capacity.
The total power demand of the devices that use the grid
connection must not exceed the grid capacity.
The load management feature prevents that the system
exceeds the grid capacity and prevents damage of the
fuses. At times when the current demand is high, the EVSE
decreases the output of current. The current will increase
again when there is availability on the grid. Also, the load
management feature makes sure that the available load is
optimally shared.