ABB Turbocharger VTC..4
Seite / Page 1
Demontage und Montage
Kap. / Chap. 5
Disassembly and assembly
ABB Turbo Systems Ltd
HZTL 10104
- D -
Volume: 49 Seiten
Edition: 12 / 2009
5
Demontage
und Montage
5
Disassembly
and assembly
Inhalt
1 Einleitung .................................................3
2 Gewichte ..................................................5
3 Turbolader abbauen
und anbauen ............................................9
und montieren ........................................ 11
4.1 Rotorblock ausbauen ............................. 11
4.2 Axial- und Radialspiele ..........................15
4.3 Abdeckring ersetzen ..............................17
4.4 Düsenring ersetzen ................................19
4.5 Rotorblock einbauen ..............................21
5 Rotorblock demontieren
und montieren ........................................23
demontieren ...........................................23
Lager ausbauen .....................................27
Lager ausbauen .....................................29
der Lager ................................................31
5.5 Turbinenschaufeln ersetzen ..................33
5.6 Verdichterradsatz ersetzen ....................33
5.7 Turbinenseitiges Lager einbauen ...........35
5.8 Verdichterseitiges Lager einbauen .........37
Content
the turbocharger .......................................9
4 Disassembling and assembling
turbocharger ............................................ 11
4.1 Removing the cartridge group ................ 11
4.2 Axial and radial clearances ....................15
4.3 Replacing the cover ring ........................17
4.4 Replacing the nozzle ring .......................19
4.5 Installing the cartridge group ..................21
5 Disassembling and assembling
cartridge group .......................................23
the set of compressor wheels ................23
the compressor end bearing ..................27
the turbine end bearing ..........................29
5.4 Inspection and assessement of
bearing condition ....................................31
5.5 Replacing the turbine blades .................33
compressor wheels ................................33
5.7 Installing the turbine end bearing ...........35
end bearing ............................................37
Summary of Contents for HT842620
Page 4: ......
Page 5: ...0 Preliminary remarks Vorbemerkungen ...
Page 6: ......
Page 18: ...1 Instructions on safety and hazards Sicherheits und Gefahrenhinweise ...
Page 19: ......
Page 33: ......
Page 34: ...2 Putting into operation Inbetriebnehmen ...
Page 35: ......
Page 52: ...3 Operation and maintenance Betrieb und Unterhalt ...
Page 53: ......
Page 90: ...Troubleshooting Beheben von Störungen 4 ...
Page 91: ......
Page 98: ...Disassembly and assembly Demontage und Montage 5 ...
Page 99: ......
Page 149: ......
Page 150: ...Taking out of operation Ausserbetriebnehmen 6 ...
Page 151: ......
Page 161: ......
Page 162: ...Appendix Anhang 7 ...
Page 163: ......
Page 165: ...10109 ABB Turbo Systems Ltd C Seite Page 2 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix ...
Page 208: ...ABB Turbo Systems AG Bruggerstrasse 71a CH 5400 Baden Switzerland ABB ...