8
Electrical installation of the charge post
8.1
General procedure
Note: For a detailed overview of all electrical connections, refer to
section
.
Preliminary requirements
1.
The DC power cables are
installed in one of the
cable conduits. Refer to
2.
The other cables are
installed in the other cable
conduits. Refer to section
.
•
Procedure
1. Open the door of the charge post. Refer to section
.
2. Remove the protection plate. Refer to section
3. Connect the cables to the charge post:
•
•
DC power cable. Refer to section
•
AC auxiliary power cable. Refer to section
•
Interlock and DC guard cable. Refer to section
•
Optical CAN cable from the power cabinet. Refer to section
•
Control cables for the tilt sensor (option). Refer to section
.
•
Ethernet cable. Refer to section
4. Install the protection plate.
5. Close and lock the door of the charge post. Refer to section
8.2
Connect the PE wire
Preliminary requirements
1.
The door is open.
•
Cable lug. Refer to section
.
•
Fasteners M11. Refer to
.
•
Wire stripper pliers
•
Wire cutter
•
Torque wrench
•
Electrical installation of the charge post
9AKK107992A6488-EN | 004
55
Summary of Contents for HP CP500
Page 103: ...Technical data 9AKK107992A6488 EN 004 103 ...
Page 104: ......