6
Installation
6.1
General installation procedure
Preliminary requirements
1.
The AC input cable is
available.
2.
The foundations for the
cabinets are done.
3.
All cables are in the cable
conduits and the full cable
slack is applied.
4.
The substation is
prepared.
5.
The site is prepared.
•
There is no voltage on the
AC input cable during the
complete installation
procedure.
•
Tools for installation. Refer
to section
Procedure
1. Do the mechanical installation of the power cabinet or the power cabinets. Refer
2. Do the mechanical installation of the charge post or the charge posts. Refer to
section
3. Do the electrical installation of the power cabinet or the power cabinets. Refer
4. Do the electrical installation of the charge post or the charge posts. Refer to
section
5. Prepare for commissioning. Refer to section
6.2
Mechanical installation of the power cabinet
6.2.1
Install the power cabinet - general procedure
Preliminary requirements
1.
The cabinet is above the foundation.
Procedure
1. Remove the plinth covers of the power cabinet. Refer to section
2. Install the cabinet on the foundation. Refer to section
.
3. Open the cable inlets. Refer to section
.
4. Guide the cables to the power cabinet. Refer to section
5. Close the cable inlets. Refer to section
6. Install these parts:
a. Cover plate of the foundation. Refer to section
b. Plinth covers of the power cabinet.
7. Replace the eye bolts on the power cabinet with the caps. Refer to section
.