6.3.2
Remove the cable gland plates
Preliminary requirements
1.
The door is open.
2.
The protection cover is
removed.
•
Screwdriver, cross
•
Set of open spanners
Procedure
1. Remove these parts:
a. Fasteners (A)
b. Cable gland plates (B)
c. Nuts (C) of the cable glands
6.3.3
Install the charge post on the foundation
Preliminary requirements
•
Hoisting equipment or
forklift truck
•
Torque wrench
•
Six fasteners M12 and
washers
•
Drop in anchors, for easy
installation and quality
Procedure
1. Carefully lower the charge post on the
foundation with a hoisting equipment
or a forklift truck. Refer to section
Caution: Make sure that
there is no kink in the
cables.
2. Make sure that the holes in the charge
post (A) and the foundation (B) are
aligned.
3. Install the fasteners (C) and the
washers.
4. Tighten the fasteners to the correct
torque. For the specification, refer to
section
C
A
B
A
C
B
Installation
9AKK107992A6488-EN | 004
41
Summary of Contents for HP CP500
Page 103: ...Technical data 9AKK107992A6488 EN 004 103 ...
Page 104: ......